•Location: Shenyang, Liaoning Province
•Country: Malaysia
•Construction: 2015~2016
•Built area: 58,020 m2
•Work Description: EPCM
For LSH’s project in Shenyang, Unique team met the schedule and the site was shut down on 31st of January. Since taking over the project, the site has recorded over 284,770 incident free man hours. At UCC Safety is always our priority, and we live by a safety mantra, “Do it Safely or don’t do it at all.”